Image by American Public Power Associati

Hydropower including Small Hydro 

We provide concept to commissioning services in the hydropower and small hydro sector. We have successfully executed more than 30 projects in Large and Small Hydropower sector. We specialise in troubleshooting technical bottlenecks in the project thus delivering enhanced value to our customers.   
Projects
topographical.jpg
Topographical Survey of Likhu Hydel Projects, Nepal, 2019
l4.jpg
Tariff Petition Review 132 KV Transmission System For Dikshi HEP, Arunachal Pradesh
Detail1.png
Detail Design And Engineering Of 500 KW Bhaghlan MHP, Afghanistan, 2019
Due1.png
Due Diligence Of 76 MW Phata Byung HEP, Uttarakhand
desgigandeng1.jpg
Design And Engineering Of 6 MW Challawa HEP, Nigeria, 2018
monitor1.png
Design and Monitoring - Penstock Works At 600 MW Kameng HEP, Arunachal Pradesh, 2018
duedili1.png
Due Diligence Of 500 MW Teesta VI, Sikkim, 2018
pandoh1.png
Detailed Design and Drawings of  Pandoh-Takoli Tunnel, Himachal Pradesh, 2018
detailshp1.jpg
Detailed Design and Drawings 3.5 MW Chachyot SHP, Himachal Pradesh, 2018
technicaladvi1.png
Technical Advisory On 1856 MW Sawalkot HEP, Jammu & Kashmir, 2018
assesment1.jpg
Assessment Of Damages Due To Flash Flood & Heavy Rains In The Power House Of IKU II SHEP,  Himachal Pradesh
technicalevaluation2.jpg
Technical Evaluation Of 1750 MW Demwe Lower HEP, Arunachal Pradesh, 2018
preperation1.png
Preparation of Detailed Design Report Of  390 MW Kirthai HEP, J&K, 2018
layout1.jpg
Layout Optimization Study Of 240 MW Kuther HEP, Himachal Pradesh, 2018
sawalkot2.jpg
Bid Stage Support for Pakaldul HEP, Jammu And Kashmir, 2018
detailed designhp1.png
Detailed Design and Engineering Of 5 MW Gaj III SHP, Himachal Pradesh, 2017
detailedbahrma3.jpg
Detailed Project Report Of 2 MW Bahram Gala-I SHEP, J&K, 2017
engreview1.png
Engineering Review Of 500 MW Teesta –VI HEP, Sikkim 2017
detailed designhp1.png
Review Of Dam Performance, Preparation Of Overall Assessment Report 60 MW Tuirial HEP, Mizorum
strategicplanning1.png
Strategic Planning For Pare Dam Work 110 MW Pare HEP, Arunachal Pradesh
designsuper1.png
Design, Engineering And Supervision Of Civil Foundation 4 MW Galogi SHEP, Uttarakhand
prefeasability1.jpg
Pre-Feasibility Report Of 45 MW Lujai Hydro Electric Project, Himachal Pradesh
engsupport1.png
Engineering Support For Underground Work Of 76 MW Phata Byung HEP, Uttarakhand
designopti.png
Design Optimization And Other Technical Support For 500 MW Teesta VI HEP
prefeasabilityuganada1.png
Pre-Feasibility Report/Engineering Optimization For Uhuru Hydro Project, Uganda
feasabilityrepo1.jpg
Feasibility Report For 2 X 2.3 MW Luj HEP (Himachal Pradesh)
designopti.png
Bid Support For 125 MW Kundah Pump Storage HEP, Tamil Nadu
detailedmyanmar1.png
Detailed Project Report Of 1.2 MW Tamu Small Hydro Project, Myanmar, 2014
tendereng1.png
Tender Engineering Services For 70 MW Chavuma Hydroelectric Project, Zambia, 2014
aruna1.png
Detailed Project Report  Of 67 MW Simang HEP, Arunachal Pradesh, 2013 
detailedsikkim3.png
Detailed Dynamic Analysis Of Concrete Face Rockfill Dam - 1200 MW Teesta-III HEP, Sikkim, 2013
sawalkot1.png
Detailed Project Report Of 1856 MW Sawalkot HEP, J&K , 2012
power-transmission-substations-1.jpg
Tariff Petition Review Of 24 MW Dikshi HEP, Arunachal Pradesh